Cull Park Stormwater Drainage Upgrade

Middleton Road, Albany WA

Date: 18/01/2016

The work involves excavation and installation of new reinforced concrete stormwater pipes, pits, grates and connections commencing on Campbell Road (above Middleton Road roundabout), crossing Campbell Road to replace current verge stormwater. All pipes along Middleton Beach Road will connect with the existing pipe work along Middleton Road from Symers Street. A pipe shall be installed crossing Middleton Beach Road and continued (retrofitted) through an existing unit development to join additional concrete pipes laid within undeveloped road reserve. The Stormwater pipe is continued through private undeveloped estate to terminate on Cockburn Road where the new pipe will be joined to existing stormwater pits and system.